e6vk
 

 
 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 Under
the Securities Exchange Act of 1934
For the month of December, 2006
Cameco Corporation
(Commission file No. 1-14228)
2121 – 11th Street West
Saskatoon, Saskatchewan, Canada S7M 1J3
(Address of Principal Executive Offices)
Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
     
Form 20-F o
  Form 40-F þ
Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.
     
Yes o
  No þ
If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b):
 
 


 

Page 2

Exhibit Index
         
Exhibit No.   Description   Page No.
 
       
1.
  Press Release dated December 22, 2006   3-4
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
         
Date: December 22, 2006  Cameco Corporation

 
 
 
  By:   /s/ "Gary M. S. Chad"    
    Gary M.S. Chad   
    Senior Vice-President, Governance, Legal and Regulatory Affairs, and Corporate Secretary   


 

Page 3

         
FORM 51-102F3
MATERIAL CHANGE REPORT
Item 1 — Name and Address of Company
Cameco Corporation (“Cameco”)
2121 – 11th Street West, Saskatoon, Saskatchewan S7M 1J3
Item 2 — Date of Material Change
December 21, 2006
Item 3 — News Release
The English version and the French translation version of the press release relating to this material change were distributed and filed by Canadian Corporate News through their Canadian Timely Disclosure Pack and U.S. Timely Disclosure Pack on December 21, 2006.
Item 4 — Summary of Material Change
On December 21, 2006, Cameco reported it is proceeding with a phased plan to restore the underground workings at Cigar Lake after a water inflow on October 23, 2006 flooded the project.
The first phase of the remediation plan involves drilling holes down to the source of the inflow. Concrete will be pumped through the drill holes and sealed off with grout. Subsequent phases include removing water from underground areas, ground freezing in the area of the inflow, restoring other underground areas and resumption of mine development. Regulatory approval is required for each phase of the remediation plan.
Drilling through the Athabasca sandstone has been more challenging than anticipated.
Cameco will be in a better position to estimate when it expects the first phase to be completed after the first concrete is poured. Cameco had expected to be pouring concrete in December, as part of the first phase, but that is now expected to occur in January 2007.
Item 5 — Full Description of Material Change
On December 21, 2006, Cameco reported it is proceeding with a phased plan to restore the underground workings at Cigar Lake after a water inflow on October 23, 2006 flooded the project.
The first phase of the remediation plan involves drilling holes down to the source of the inflow. Concrete will be pumped through the drill holes and sealed off with grout. Subsequent phases


 

Page 4

include removing water from underground areas, ground freezing in the area of the inflow, restoring other underground areas and resumption of mine development. Regulatory approval is required for each phase of the remediation plan.
Drill crews completed one hole in the area of the rockfall and nearly completed another hole before leaving for their Christmas break. About 18 holes are now planned including four for mine dewatering. The crews will resume working on December 27, 2006 working around the clock, seven days a week.
Drilling through the Athabasca sandstone has been more challenging than anticipated.
Cameco will be in a better position to estimate when it expects the first phase to be completed after the first concrete is poured. Cameco had expected to be pouring concrete in December, as part of the first phase, but that is now expected to occur in January 2007.
Cameco plans to provide preliminary capital cost estimates and timelines for the remediation in February 2007, as previously indicated. Cameco continues to work in consultation with international experts to develop a comprehensive remediation plan including contingency options.
Based on current plans, Cameco expects the remediation phases mentioned above will fall within the scope of the original environmental assessment of the Cigar Lake project. Cameco is working closely with the Canadian Nuclear Safety Commission and Saskatchewan regulatory agencies to achieve timely approvals for the various elements of the plan.
The Cigar Lake project is a joint venture owned by Cameco Corporation (50%), AREVA Resources Canada Inc. (37%), Idemitsu Uranium Exploration Canada Ltd. (8%) and TEPCO Resources Inc. (5%). The project is located in northern Saskatchewan.
Item 6 — Reliance on subsection 7.1(2) or (3) of National Instrument 51-102.
Not applicable.
Item 7 — Omitted Information
Not applicable.
Item 8 — Executive Officer
Gary M.S. Chad
Senior Vice-President, Governance, Legal and Regulatory Affairs, and Corporate Secretary
Cameco Corporation
(306) 956-6303
Item 9 — Date of Report
December 22, 2006.