Skip to main content

DRG Construction Selected to Assist in Historic 80 Million Oyster Restoration Project in New York Harbor

ⓘ This article is third-party content and does not represent the views of this site. We make no guarantees regarding its accuracy or completeness.

DRG Construction is selected to help deploy 80 million oysters for the historic Living Breakwaters coastal resiliency project in New York Harbor.

-- DRG Construction, a marine construction firm specializing in waterfront infrastructure and shoreline stabilization, has been selected to assist in the installation of 80 million oysters as part of the Living Breakwaters Project off the southern coast of Staten Island. This initiative represents a milestone in the broader New York harbor restoration movement, serving as one of the largest marine ecosystem recovery and coastal resiliency efforts ever undertaken in the region.

The Living Breakwaters project, situated in the waters of Raritan Bay, is a first-of-its-kind coastal defense system. Designed to manage the physical threats of climate change, the partially submerged breakwater structures are engineered to reduce wave energy, mitigate shoreline erosion, and protect vulnerable coastal communities from severe storm surges. Beyond physical shoreline protection, the breakwaters serve as the structural foundation for a major biological recovery effort.

DRG Construction will play a central role in deploying and installing the specialized oyster habitat systems throughout the designated breakwater zones. Historically, New York Harbor was home to vast, naturally occurring oyster reefs that provided critical biological filtration and coastal buffering before being depleted by industrialization and overharvesting. The installation of tens of millions of oysters aims to naturally rebuild these lost ecosystems. Once established, the living reefs will continuously filter harbor water, foster diverse marine habitats, and naturally strengthen the physical integrity of the breakwaters over time.

Carrying out marine construction of this scale requires specialized technical capabilities and experience with heavy over-water operations. Working within active marine environments like Raritan Bay presents complex logistical demands, including managing shifting tides, operating heavy machinery on floating barges, and adhering to strict placement tolerances. DRG Construction will utilize its fleet of specialized marine equipment, including cranes and transport barges, to ensure the habitat systems are securely anchored to the breakwater foundations.

This contract reinforces the growing industry shift toward green and living infrastructure solutions that merge heavy civil engineering with environmental stewardship. By integrating biological restoration directly into coastal defense design, the Living Breakwaters project serves as a model for modern waterfront resiliency projects worldwide.

About DRG Construction

With over 20 years of marine construction experience, DRG Construction specializes in waterfront infrastructure, shoreline stabilization, dredging, pile installation, floating dock systems, bulkheads, and seawalls. Operating in New York and Florida, the family-owned firm delivers specialized engineering solutions to protect and restore coastal environments for public, private, and municipal clients.

For more information, please refer to the contact details below.

Contact Info:
Name: Sabrina Dentice
Email: Send Email
Organization: DRG Construction
Address: 245 S Main Street Freeport, NY 11520
Phone: 516 415 7774
Website: https://drgconstructionus.com/

Release ID: 89198668

In case of identifying any problems, concerns, or inaccuracies in the content shared in this press release, or if a press release needs to be taken down, we urge you to notify us immediately by contacting error@releasecontact.com (it is important to note that this email is the authorized channel for such matters, sending multiple emails to multiple addresses does not necessarily help expedite your request). Our dedicated team will be readily accessible to address your concerns and take swift action within 8 hours to rectify any issues identified or assist with the removal process. We are committed to delivering high-quality content and ensuring accuracy for our valued readers.

Report this content

If you believe this article contains misleading, harmful, or spam content, please let us know.

Report this article

Recent Quotes

View More
Symbol Price Change (%)
AMZN  233.77
-11.08 (-4.53%)
AAPL  320.71
-5.18 (-1.59%)
AMD  536.18
-16.15 (-2.92%)
BAC  61.36
-0.26 (-0.42%)
GOOG  318.47
-23.44 (-6.86%)
META  607.02
-20.14 (-3.21%)
MSFT  380.88
-9.46 (-2.42%)
NVDA  207.71
-4.35 (-2.05%)
ORCL  120.02
-5.82 (-4.62%)
TSLA  320.73
-53.28 (-14.25%)
Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the Privacy Policy and Terms Of Service.